Bayliss Boatworks
  • On The Water
  • In Production
  • About Bayliss Boatworks
  • Own A Bayliss
  • Bayliss Boatyard
  • Careers
  • Videos
  • Shop

Home / B42 / Hull 42 Owner Update – September 5, 2025

Hull 42 Owner Update – September 5, 2025

Cabin jigs cut and ready for installationCabin jigs cut and ready for installation
Cabin jig frame in placeCabin jig frame in place
Cabin jigs being installedCabin jigs being installed
Cabin jigs in placeCabin jigs in place
Cabin planking in processCabin planking in process
Bridge jigs in placeBridge jigs in place
Bridge planked; Awlfair/primer applied and sanding in progressBridge planked; Awlfair/primer applied and sanding in progress
Cabin handrail installedCabin handrail installed
Cabin sanding in progress post awlfair/primerCabin sanding in progress post awlfair/primer
Cabin ready to move outside for curingCabin ready to move outside for curing
Hull jig in placeHull jig in place

In the News
Big Deal (Bayliss 75′) Delivered

Max Bet (Bayliss 64′) Delivered

Sequentis (Bayliss 60′) Delivered

Bayliss Boatworks
  • Home
  • On The Water
  • In Production
  • Bayliss Boatyard
  • About BAYLISS BOATWORKS
  • Shop
  • Contact Us
  • Careers

Bayliss Boatworks

600 Harbor Road
Wanchese, NC 27981

Mailing Address

P.O. Box 300
Wanchese, NC 27981

Let's Chat

Phone: (252) 473-9797
Fax: (252) 473-9922


Newsletter Sign Up

© 2026 Bayliss Boatworks.

Newsletter Sign Up

  • This field is for validation purposes and should be left unchanged.